Turbine and compressor repair at Shazand Petrochemical Olefin Plant

slide-2feca5b
slide-f145459
slide-444258c
slide-f4fec89

Objectives of the project:

Repair and optimization of turbines and compressors of Shazand Petrochemical Olefin Unit

 

Geographical location of the project:

Shazand Petrochemical – 22nd km of Arak-Hamedan road

 

The Shazand Petrochemical Complex (Arak) is one of the largest and most prominent industrial projects implemented after the victory of the Islamic Revolution in Iran. This key and infrastructural project was designed and implemented to achieve the overall goals of the petrochemical industry, create a platform for the development of parent industries, and support the growth of downstream industries. In line with the economic and social policies of the First Five-Year Plan of the Islamic Republic of Iran, this project has now completed its completion stages and has reached the exploitation stage, representing an important step in the country’s industrial development path.

 

Project Implementation Activities:

Mahshahr Civil Engineering Company, utilizing its expert, technical, experienced, and efficient workforce in all specialized fields, was able to play a key and essential role in improving and optimizing the performance of the compressors of Arak Petrochemical Olefin Unit in 2010. This achievement is the result of close and coordinated cooperation between the company’s various teams, which has been made possible by relying on up-to-date technical knowledge and valuable experience in this field.

 

Key layout times:

Project Start: July 2010

Project Duration: 1 month and 11 days